Current Construction Projects
2023 CIPP Rehabilitation Project
Previous slide
Next slide
- Project Background
- The District has evaluated the condition of the three main outfall pipes from Camp Williams to 9000 South.
- The pipes are reaching the end of their service life and need to be lined
- This project is the third year of a multi-year phased outfall lining project
- Project Purpose and Scope
- To rehabilitate portions of the District’s three main outfall lines
- Engineer
- CONSOR
- Contractor
- Inliner Solutions
- Project Status
- Final Completion is scheduled for November 22, 2023
13900 South between 2700 West and 2950 West
- Project Background
- Bluffdale City requested sanitary sewer in a new road located at 13900 South between 2700 West and 2950 West.
- This will be a joint project with Bluffdale City.
- The Board approved this project on January 25, 2022.
- Project Purpose and Scope
- To install an 8″ sewer line in a new road in Bluffdale City.
- Engineer
- Bluffdale City
- Project Status
- Work has commenced
Hidden Valley Sewer Extension
- Project Background
- Two developers have contacted the District about developments at the Geneva Gravel Pit site, where there is currently no sewer available.
- There is currently no sewer available in this quadrant.
- Project Purpose and Scope
- Extend the sewer to the two developments that can also accommodate the future developments at the Geneva Gravel Pit site.
- Engineer: JUB Engineers
- Project Status
- The District is accepting bids for the project.
- The estimated completion date for the project is April 15, 2024.
- Emergency Info
-
Life Threatening Situations
Call 911 -
Manholes, piping, lift stations, etc.
Call (801) 571-1166 -
Wastewater treatment plant in Riverton
Call (385) 202-2730 -
Slug/spill of prohibited substances into the sanitary sewer system from a commercial or industrial facility
Call (385) 202-2777
After Hours Emergency Phone Numbers